Labels
Harry
(118)
Rubie
(112)
Will
(81)
Planning
(71)
Research
(57)
Audience Research
(16)
Analysis
(15)
Credit Research
(15)
Location
(10)
Meeting
(10)
Preliminary Planning
(8)
Editing
(5)
Fonts
(5)
Music
(5)
Costumes
(4)
Filming
(4)
Lighting
(4)
Props
(4)
Risk Assessment
(4)
Evaluation
(3)
Logo
(3)
Storyboard
(3)
Blog Editing
(2)
Software
(2)
Equipment
(1)
Final Cut
(1)
Rough Cut
(1)
Weather Report
(1)
Blog Archive
-
▼
2012
(86)
-
▼
January
(68)
- Detailed Shot List
- Film Timing Schedule
- Maps of Location
- Transport Update
- Deserted Barn Photos
- Risk Assessment Final Update
- New Location Photos
- New Location Update
- Filming Update
- Meeting 9 - 26/1/11
- Transistions
- Garage Band Software Consideration Music And Audio
- Software Being Used And Considered
- Booking Out Equipment
- Equipment Being Used In Our Opening
- Eqiupment We Plan To Use
- Meeting 8 - 23/1/12
- Transportation
- Film Schedule
- Weather Report
- Progress Report
- Filming Update
- Credit Experiments
- Credit Draft Extended
- Credit Draft
- Opening Credits
- Chosen Title
- Final Cast And Crew
- Script
- Music For Our Thriller
- Sound Research
- Alternative Camera Shots
- Shotlist
- New Costumes
- New Lighting
- New Props
- Risk Assessment Update
- Train Track Location Photo's
- Warehouse Location Photo's
- Location Permission
- New Location
- Font Idea
- Alternative Fonts
- New Font
- Implementation of Audience Research
- New Final Storyline
- New Thriller Opening Summary
- Meeting 7 - 18/1/12
- New Animatic Storyboard
- New Storyboard
- Group Update
- Progress Report
- Risk Assessment Train Tracks
- Risk Assessment
- Fonts
- Fonts
- Conventions Associated And Within Thrillers
- Conventions Within Thrillers
- Lighting
- Lighting
- Location
- Location
- Props
- Props
- Costumes
- Costumes
- Costumes
- Meeting 6 - 5/1/12
-
▼
January
(68)
Sunday, 22 January 2012
Progress Report
Following on from previous posts, I decided to update how we're doing. Today we had a group meeting in which all of us attended and decided that as we have had to adjust and add new posts regarding new location, costumes and transportation ect that we are going to work together and present them as group posts as it would be a more efficient way of making up for lost time after the adaptation of our original idea's and plans. We hope to have everything finalised and in place by the 28/1/12. We will post how we get on later this week.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment