Following on from our last updated location post we have since had to change that location to one that is closer and more plausible to get to. As the locations are now less than a 10 minute walk away from each other the continuity will be a lot more realistic. The weather changes will also be less drastic and it will be a lot more efficient to film all of our footage in one day at one area.
Above is our new location, the Coopersale Cricket Club. It will be great to film as it looks old and somewhat unused which will fit the criteria for or opening perfectly. However there is a strong possibility that we might not be able to go inside, although we are going to see if we can get permission to enter the building as this is what we did originally plan to do in our storyboard. However we also have another location in which we could also use close to the cricket club a deserted barn which would also fit perfectly with our storyboard and storyline as well new props such as a gate and padlock as mentioned in a previous post. Below is a birds eye view of the deserted barn from google maps and a picture of it's iconic gates.
Labels
Harry
(118)
Rubie
(112)
Will
(81)
Planning
(71)
Research
(57)
Audience Research
(16)
Analysis
(15)
Credit Research
(15)
Location
(10)
Meeting
(10)
Preliminary Planning
(8)
Editing
(5)
Fonts
(5)
Music
(5)
Costumes
(4)
Filming
(4)
Lighting
(4)
Props
(4)
Risk Assessment
(4)
Evaluation
(3)
Logo
(3)
Storyboard
(3)
Blog Editing
(2)
Software
(2)
Equipment
(1)
Final Cut
(1)
Rough Cut
(1)
Weather Report
(1)
Blog Archive
-
▼
2012
(86)
-
▼
January
(68)
- Detailed Shot List
- Film Timing Schedule
- Maps of Location
- Transport Update
- Deserted Barn Photos
- Risk Assessment Final Update
- New Location Photos
- New Location Update
- Filming Update
- Meeting 9 - 26/1/11
- Transistions
- Garage Band Software Consideration Music And Audio
- Software Being Used And Considered
- Booking Out Equipment
- Equipment Being Used In Our Opening
- Eqiupment We Plan To Use
- Meeting 8 - 23/1/12
- Transportation
- Film Schedule
- Weather Report
- Progress Report
- Filming Update
- Credit Experiments
- Credit Draft Extended
- Credit Draft
- Opening Credits
- Chosen Title
- Final Cast And Crew
- Script
- Music For Our Thriller
- Sound Research
- Alternative Camera Shots
- Shotlist
- New Costumes
- New Lighting
- New Props
- Risk Assessment Update
- Train Track Location Photo's
- Warehouse Location Photo's
- Location Permission
- New Location
- Font Idea
- Alternative Fonts
- New Font
- Implementation of Audience Research
- New Final Storyline
- New Thriller Opening Summary
- Meeting 7 - 18/1/12
- New Animatic Storyboard
- New Storyboard
- Group Update
- Progress Report
- Risk Assessment Train Tracks
- Risk Assessment
- Fonts
- Fonts
- Conventions Associated And Within Thrillers
- Conventions Within Thrillers
- Lighting
- Lighting
- Location
- Location
- Props
- Props
- Costumes
- Costumes
- Costumes
- Meeting 6 - 5/1/12
-
▼
January
(68)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment