iMac - The apple computer has specially made software for the device such as iMovie and Final cut which is exclusive for it allowing our group to be able to edit and organise our selected and wanted clips from our school video camera to the computer making it look more professional and believable towards our audiences. We also have past experience when using Apple's computers which won't affect us instead if we had to take more time to understand the functions of it.
Panasonic HDC-SD9 - This video camera is compatible with the iMacs when transferring the video clips over as well as being able to edit them on the software that we have chosen to use which makes the product suitable for out purpose. The camera also has a battery life that can last up to an hour which is just right for the small amount of filming we have to produce due to us being away from a charger because we will be filming outside mainly it won't hopefully affect us when filming if it shuts down.
Tripod - The tripod we are going to be using is fully compatible with the video camera that we are also going to use. This allows us to produce steady camera shots when filming therefore making our opening film more professional looking. Its also is portable allowing us to easily transport it to one location to the another (Epping to Saffron Walden.)
Labels
Harry
(118)
Rubie
(112)
Will
(81)
Planning
(71)
Research
(57)
Audience Research
(16)
Analysis
(15)
Credit Research
(15)
Location
(10)
Meeting
(10)
Preliminary Planning
(8)
Editing
(5)
Fonts
(5)
Music
(5)
Costumes
(4)
Filming
(4)
Lighting
(4)
Props
(4)
Risk Assessment
(4)
Evaluation
(3)
Logo
(3)
Storyboard
(3)
Blog Editing
(2)
Software
(2)
Equipment
(1)
Final Cut
(1)
Rough Cut
(1)
Weather Report
(1)
Blog Archive
-
▼
2012
(86)
-
▼
January
(68)
- Detailed Shot List
- Film Timing Schedule
- Maps of Location
- Transport Update
- Deserted Barn Photos
- Risk Assessment Final Update
- New Location Photos
- New Location Update
- Filming Update
- Meeting 9 - 26/1/11
- Transistions
- Garage Band Software Consideration Music And Audio
- Software Being Used And Considered
- Booking Out Equipment
- Equipment Being Used In Our Opening
- Eqiupment We Plan To Use
- Meeting 8 - 23/1/12
- Transportation
- Film Schedule
- Weather Report
- Progress Report
- Filming Update
- Credit Experiments
- Credit Draft Extended
- Credit Draft
- Opening Credits
- Chosen Title
- Final Cast And Crew
- Script
- Music For Our Thriller
- Sound Research
- Alternative Camera Shots
- Shotlist
- New Costumes
- New Lighting
- New Props
- Risk Assessment Update
- Train Track Location Photo's
- Warehouse Location Photo's
- Location Permission
- New Location
- Font Idea
- Alternative Fonts
- New Font
- Implementation of Audience Research
- New Final Storyline
- New Thriller Opening Summary
- Meeting 7 - 18/1/12
- New Animatic Storyboard
- New Storyboard
- Group Update
- Progress Report
- Risk Assessment Train Tracks
- Risk Assessment
- Fonts
- Fonts
- Conventions Associated And Within Thrillers
- Conventions Within Thrillers
- Lighting
- Lighting
- Location
- Location
- Props
- Props
- Costumes
- Costumes
- Costumes
- Meeting 6 - 5/1/12
-
▼
January
(68)
Monday, 23 January 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment